Everything about 4-8-2 totally explained
Under the
Whyte notation for the classification of
steam locomotives, a
4-8-2 locomotive has four
leading wheels (generally arranged in a leading truck), eight coupled
driving wheels and two
trailing wheels (often but not always in a trailing truck). This type of steam locomotive is also known as the
Mountain type.
Other equivalent classifications are:
UIC classification:
2'D1' (also known as
German classification and
Italian classification)
French classification:
241
Bulgarian classification:
2-4-1
Turkish classification:
47
Swiss classification:
4/7
The first 4-8-2
The 4-8-2 type, like the
4-6-2, originated in
New Zealand. The first of 18
X class 4-8-2
De Glehn compound locomotives were designed by
A. L. Beattie and built by
New Zealand Railways Department's
Addington Workshops in
Christchurch in 1908. It was designed to haul heavy freight trains on the mountainous central section of the
North Island Main Trunk Railway. It is possible that this was the source of the "Mountain" nickname that was applied to the 4-8-2 type, though it's often said the name originates from the
Chesapeake and Ohio Railroad in the United States, who named the type "Mountain" after the
Allegheny Mountains their first 4-8-2s were built to tackle.
One member of the pioneering X class survives and is currently located at the depot of the
Feilding and District Steam Rail Society.
Although the X class was the first 4-8-2 locomotive, it's perhaps not a classic example of the type. The X class' trailing truck was positioned well behind a narrow firebox which itself sat above the driving wheels, necessitating the same design compromise between driving wheel diameter and boiler/grate size as a
2-8-0 or
4-8-0 design. Later, more successful 4-8-2 designs were a progression of the classic
4-6-2 layout, which featured a wide firebox positioned above the trailing truck and behind the driving wheels, allowing for a large firebox as well as large driving wheels.
North America
The 4-8-2 was most popular on the North American continent, where Pacifics were becoming over-burdened as passenger trains grew in length and weight. The first North American 4-8-2 locomotives were built by
ALCO for the
Chesapeake and Ohio Railroad in 1911. ALCO combined the traction of the eight-drivered
2-8-2 "Mikado" with the excellent tracking qualities of the Pacific's four-wheel leading truck.
Although the C&O intended their new Mountains for passenger service, the type proved ideal for the new, faster freight service the
railroads were introducing. Many 4-8-2s were built for dual service.
Mountain type locomotives were built for 41 American railroads; approximately 2200 were built. The largest users were the
New York Central Railroad with 435 of what they named the
Mohawk type (the
Water Level Route had no need for "Mountains", after all!); the
Pennsylvania Railroad with 224 class
M1 and M1a locomotives, used mostly for fast freight service; the
Florida East Coast with 90 passenger locomotives; the
New Haven with 70; and the
Southern Railway with 58.
European use
Britain
Britain's population of Mountains consists entirely of two 15 inch (381 mm) gauge locomotives on the
Romney, Hythe and Dymchurch Railway, though a number of double-Mountain (4-8-2+2-8-4)
Garratts were built for export.
Bulgaria
In 1941
Bulgarian State Railways (BDZ) placed order against
Henschel & Sohn - Kassel (Germany) for building of 50 standard gauge (1435mm) express passenger locomotives of type 2'D1'h3S (wheel arrangement 2-4-1, simple steam expansion, superheating, 3-cylinder, fast train service), capable to haul heavy passenger trains through highly varied, often severe profiles of Bulgarian main lines with gradients up to 28‰ (1 in 35.7). First two engines delivered by the end of 1941 very quickly proved their perfect qualities as well as the correctness of the specification made by BDZ engineers, already having experience with insufficient power and some constructive problems of classes 01 (1'D1'h2S) and 02 (1'D1'h3S). Next year the mass production began, but alas, was interrupted by war restrictions introduced by German authorities, and subsequently the delivery was totally canceled. Only 10 engines were built and delivered in the end of 1942 - beginning of 1943, so the total number of the new BDZ class 03 remained 12 engines (03.
01 - 03.
12). After 1958 all of them gradually were converted to mixed fuel oil and coal firing, which resulted in improved steam production and facilitated service especially on mountainous lines. For about 35 years of use they showed excellent performance and minor problems (oval wearing of leading axle's inside crank). One of these machines, 03.
12 (serial No. 26575) after factory repair was preserved in perfect condition in the depot of Gorna Oryahovitsa
(External Link
) and is to be returned to operation under steam for tourist trains.
Technical specifications:
| Class | 03 |
| Numbers | 03.01 - 03.12 |
| Gauge, mm |
1435 |
| Type (UIC) |
2'D1'h3S |
| Type (BDZ) |
Б2-4-117 |
| Builder |
Henschel & Sohn - Kassel |
| Year |
1941-42 |
| Steam pressure, kg/cm2 |
16 |
| Superheater area, m2 |
81.91 |
| Heating area, m2 |
224.07 |
| Grate area, m2 |
4.87 |
| Cylinders no. x dia. x stroke, mm |
3 x 500 x 700 |
| Driving wheels diameter, mm |
1650 |
| Axleload, t |
17.3 |
| Adhesive weight, t |
69.2 |
| Total weight, t |
179.18 |
| Tender type |
2'2'T28 |
| Coal, t |
13 |
| Water, m3 |
28 |
| Total length, mm |
23105 |
| Total height, mm |
4580 |
| Tractive effort, starting, kN |
221 |
| Tractive effort @ 20km/h, kN |
191 |
Train haulage rates, t:
|
| On level |
1930 |
| On 10‰ (1 in 100) gradient |
825 |
| On 25‰ (1 in 40) gradient |
390 |
| Max speed, km/h |
100 |
Emil S. 14:54, 8 May 2008 (UTC)
Czechoslovakia
The
CSD introduced the 498.0 class 4-8-2 express passenger locomotive in 1938 after successful trials in the Tatra Mountains against an alternative
2-8-4 prototype. The design was further developed in 1954 into the 498.1 class. These technically sophisticated locomotives were reputedly capable of 11% thermal efficiency.
France
In France, these locomotives (known as the
241 type) were used on more mountainous routes as increasingly heavy loads began to overtax the capabilities of the existing
4-6-2 locomotives.
- The PLM introduced a bullet-nosed class 241A in 1925 to accelerate trains over the Seuil de Bourgogne incline. This four cylinder compound locomotive was unusual in having short connecting rods for the outside cylinders pivoted on the first driving axle, rather than the second as is typical of most six or eight coupled wheel locomotives. Perhaps as a result of this, the locomotive didn't run smoothly at speeds of greater than 100km/h (63mph). However, true to the "Mountain" type it was able to haul heavy passenger trains over gradients at speed, taking an 800 tonne load over a 1 in 200 gradient at 90 to 100km/h (56 to 63mph).
- A revised 241C class from the PLM had connecting rods linking the second and third driving axles.
- The Etat railway built a prototype 3 cylinder simple-expansion 4-8-2 which was an embarrassing failure for the company, but which was later converted by André Chapelon into the legendary 242A1 4-8-4 locomotive.
- The SNCF, with design input from André Chapelon, developed the earlier PLM 241C into the 241P class in 1948. These locomotives, although prone to axlebox problems caused by a frame not rigid enough for the (4000 indicated horsepower) output of the cylinders, were nevertheless very effective and some were still running into the early 1970s.
Spain
Spain saw over 200 of these locomotives, also known as a
2-4-1, in five classes.
African Use
The South African Railways (SAR/SAS) employed a wide variety of classes of locomotives with this wheel arrangement; in fact, locomotives with this wheel arrangement were the mainstay of the fleet. SAR also utilised a large number of 4-8-2+2-8-4 garratts.
Australia
Unlike other countries which utilised the 4-8-2 design for heavy passenger use, in Australia the 4-8-2 was more typically a heavy freight locomotive with small driving wheels and a very large firebox.
The 3 cylinder
NSWGR D57 class of 1929 was one of the largest and most powerful locomotives ever built in Australia. With a large 65 ft² (6.03 m²)
grate and 64,327 lb (29,030 kg)
tractive effort(External Link
), they were put to good use on the steep 1 in 40
gradients leading out of
Sydney on NSW's mainlines. The design was further developed in 1950 with the smaller cylindered D58 class. However, this class proved to be less successful, suffering reliability problems attributed to the rack and pinion valve gear for the third cylinder used instead of the D57's
Gresley/Holcroft valve gear.
The
Western Australian Government Railways introduced two classes of 4-8-2 locomotive for freight haulage on the state's 3 ft 6 in (1067 mm) network, the S class of 1943 and W class of 1951. The 4-8-2 layout allowed for the weight of these relatively powerful locomotives to be spread over a number of axles (the W class had a maximum axle load of just 10 tons) and also enabled the incorporation of a wide firebox for burning poor quality coal.
Further Information
Get more info on '4-8-2'.
|
External Link Exchanges
Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:
<a href="http://4-8-2.totallyexplained.com">4-8-2 Totally Explained</a>
Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned. |